Project details

Location: Malabo - Equatorial Guinea

Project description

  • East dock with 9 m mooring depth (for 27.000 DWT vessels), 350 m long. Two inclined planes for beachers, of 40 m each
  • West dock (Container Terminal) with 16 m mooring depth (for 100.000 DWT vessels), of 504 m long
  • South dock (Mixed Terminal) with 16 m mooring depth (for 100.000 DWT vessels), of 284 m long
  • extension of Naval shipyard: dock with 15,5 m mooring depth (for 20.000 DWT vessels), of 225 m long. An inclined plane for ship-building (190 m long, 62,5m wide)
  • earthworks, road base, bituminous surfacing material, curbs
  • road drainage, hydraulic structure, surface water drains
  • lighting and signaling
  • landscaping and filling of quay level surfaces that were reclaimed from the sea
  • Construction of administrative buildings